Commands:
Ribbon/Toolbar Icon | Command | Command Description |
---|---|---|
Load families
| Load the necessary families for 2D Rebar drafting. You have to load the families before you can start using RapidRebar on your project. | |
Create Rebars
| Places the Rebar families by 2 Clicks | |
Create Special Rebars
| Places the special Rebar families by 1 click
| |
Add Range
| Add a range symbol and lock it to Rebar. Choose Rebar element, then 2 clicks on the Base segment of the rebar.
| |
Slab Area
| Slab Area Set of Rebars
| |
Slab Edge
| Slab Edge Set of Rebars
| |
Contact us
| Get in touch and leave feedback for our product |
Dimensions Parameters:
Parameter Name | Input Type | Description | Further Information |
---|---|---|---|
a | Manually/Graphically | Dimensions for Rebar Segments | |
b | Manually/Graphically | Dimensions for Rebar Segments | |
c | Manually/Graphically | Dimensions for Rebar Segments | |
d | Manually/Graphically | Dimensions for Rebar Segments | |
e | Manually/Graphically | Dimensions for Rebar Segments | |
f | Manually/Graphically | Dimensions for Rebar Segments | |
angle | Manually/Graphically | additional Dimensions for "cranked" Rebars | |
h1 | Manually/Graphically | additional Dimensions for "cranked" Rebars | |
h2 | Manually/Graphically | additional Dimensions for "cranked" Rebars | |
offset | Manually/Graphically | cocnrete cover Dimension for section Rebars | |
Pile Radius | Manually/Graphically | Radius Dimension for Rebars in circular elements |
Data Parameters:
Parameter Name | Input Type | Description | Further Information |
---|---|---|---|
RR_00_Mark | Manually | here you can enter Rebar Mark | |
RR_01_Spacing amount | Auto | Amount of Rebars defined by the spacing parameters | calculated by the formula "RR_071_Spacing Range" / "RR_07_Spacing" |
RR_02_Multiplier | Manually | here you can manually enter multiplier for the amount of Rebars | this parameter will displayed in the format "nX" |
RR_03_Amount | Manually | here you can manually enter the basic amount of Rebars. | |
RR_04_Added Amount | Manually | here you can manually enter added amount of Rebars | this parameter will displayed in the format [a+b] |
RR_05_TOTAL Amount | Auto | Total amount of Rebars | calculated by the formula "RR_01_Spacing amount * RR_02_Multiplier * (RR_03_Amount + RR_04_Added Amount)" |
RR_06_Diameter | Manually | here you can change the Rebar Diameter | |
RR_07_Spacing | Manually | here you can enter Rebar Spacing | |
RR_071_Spacing range | Manually | here you can change the Rebar Spacing Range | this will affect on the "Spacing Amount" |
RR_08_Addition Spacing | Manually | here you can enter Rebar Additional value of spacing | please notice that this parameter is NOT COUNT in the amount of Rebars, it is only for tagging purpose. This parameter will displayed in the format "@s1/s2" |
RR_09_Length | Auto | Rebar Length | calculated by summing the Rebar segments values |
RR_10_Comment | Manually | Here you can enter Rebar text | you can use it for example to mention if it is "bottom rebar", "top rebar" etc. |
RR_101_Comment for schedule | Manually | here you can enter additional comment which will not appear in the tag. | you can use it to write comments on the Rebar schedule |
Title Text Parameters:
Parameter Name | Input Type | Description | Further Information |
---|---|---|---|
RR_00_TAG_Mark | Manually Yes/No | choose whether the Rebar Mark will display in the tag or not | |
RR_01_TAG_Spacing_amount | Manually Yes/No | choose whether the Rebar Spacing Amount will display in the tag or not | |
RR_02_TAG_Multiplier | Manually Yes/No | choose whether the Rebar Multiplier will display in the tag or not | |
RR_03_TAG_Amount | Manually Yes/No | choose whether the Rebar Amount will display in the tag or not | |
RR_04_TAG_Added_Amount | Manually Yes/No | choose whether the Rebar Added Amount will display in the tag or not | |
RR_05_Instead 1-4 TAG_Total_amount | Manually Yes/No | choose whether the Rebar TOTAL Amount will display in the tag or not | when this parameter is on, the tag IGNORING all the first 4 parameters |
RR_06_TAG_Diameter | Manually Yes/No | choose whether the Rebar Diameter will display in the tag or not | |
RR_07_TAG_Spacing | Manually Yes/No | choose whether the Rebar Spacing will display in the tag or not | |
RR_08_TAG_Addition_spacing | Manually Yes/No | choose whether the Rebar Addition Spacing will display in the tag or not | |
RR_09_TAG_Length | Manually Yes/No | choose whether the Rebar Length will display in the tag or not | |
RR_10_TAG_Comment | Manually Yes/No | choose whether the Rebar Comment will display in the tag or not |
Visibility Parameters:
Parameter Name | Input Type | Description | Further Information |
---|---|---|---|
Dim_a_Display | Manually 0-1-2 | choose whether and how to display dimension for particular segment | 0= do not display, 1= display below, 2= display above |
Dim_b_Display | Manually 0-1-2 | choose whether and how to display dimension for particular segment | 0= do not display, 1= display below, 2= display above |
Dim_c_Display | Manually 0-1-2 | choose whether and how to display dimension for particular segment | 0= do not display, 1= display below, 2= display above |
Dim_d_Display | Manually 0-1-2 | choose whether and how to display dimension for particular segment | 0= do not display, 1= display below, 2= display above |
Dim_e_Display | Manually 0-1-2 | choose whether and how to display dimension for particular segment | 0= do not display, 1= display below, 2= display above |
Dim_f_Display | Manually 0-1-2 | choose whether and how to display dimension for particular segment | 0= do not display, 1= display below, 2= display above |
Dim_Angle_Display | Manually Yes/No | choose whether the Angle Dimension will display or not | |
Show Dimensions | Manually Yes/No | choose whether ALL the Dimensions will display or not |
Other Parameters:
Parameter Name | Input Type | Description | Further Information |
---|---|---|---|
RR_Element Mark | Manually | here you can manually link between the rebar to the concrete element host it. can be useful for schedules | |
RR_Schedule mark | Manually | here you can manually seperate rebars to different schedules. can be useful for schedules | |
RR_Varying length | Manually Yes/No | this tells the rebar schedule to ignore the rebar Length, and instead calculate the total amount of commercial rebars needed in 1 constant length. can be useful for schedules |